
Update: Signal Lights On River Oaks Blvd
Posted on March 10th, 2025
TXDOT has a contractor working on signal repairs to Roberts Cut Off, Merritt and Long intersections on River Oaks Blvd. The contractor estimates he should be done with the repairs in roughly two weeks. They will running new wire, signals head and tightening span wires. The Signal Lights at Long, Merritt and Ohio Garden once replaced will be flashing yellow turn signals.
Return to the Previous Page